Tuesday, November 22, 2005
Cutting through the floor slabs for the Atrium
• Cutting through level two slab...
posted by sean @
11:22 AM
0 Comments:
<< Home
construction diary
Previous Posts
• Cutting through the existing first floor slab t...
• The Blue coral project has started on site. Mai...
0 Comments:
<< Home