The existing reinforced vault on the second floor is to be reused as part of the washroom facilities on the arts & entertainment level on the second floor - the steel vault door can still be seen
posted by sean @ 4:01 PM
Post a Comment
<< Home
construction diary
0 Comments:
Post a Comment
<< Home