The existing reinforced vault on the second floor is to be reused as part of the washroom facilities on the arts & entertainment level on the second floor - the steel vault door can still be seen
posted by sean @ 4:01 PM 0 comments
posted by sean @ 4:00 PM 0 comments
looking across the atrium towards where the cinema will be
posted by sean @ 3:33 PM 0 comments
construction diary